Know what is under the ground before you dig.

PRIMA is a permit to work for excavation near buried services. It takes each job from the BYDA search to locating, potholing, the engineering check and sign-off. The permit goes live on the last signature.

A section through one work area. The potholed services are verified at QL-A. The gas main is not, so this permit is still in preparation.

One permit, from the BYDA search to the permit pack.

Every permit follows the same steps in the same order. Each step belongs to a role, and a step that depends on an earlier one stays locked until that one is done.

  1. The job

    Steps: Job details, SWMS

    Mark the work area on the map, describe the job and attach the SWMS.

    Requester

  2. Underground services

    Steps: BYDA search, Asset owners

    Run the BYDA search from the permit. PRIMA reads each asset owner's response and lists the services and conditions it finds. A person checks that list before it is published.

    Requester

  3. Proof on site

    Steps: Survey results, Potholing

    The surveyor records each service where it is found, with its position and quality level. The crew marks each pothole as it is dug, and the surveyor measures the depth afterwards.

    Surveyor and crew

  4. Approach distances

    Step: Engineering check

    The requester confirms the approach distances (MAD and SAD) for each service, then signs the technical sign-off.

    Requester

  5. Controls on site

    Steps: Site controls, Checklists

    The requester and the supervisor record their site inspection, set the site controls and each complete a checklist.

    Requester and supervisor

  6. Sign-off and go-live

    Live

    Steps: Operational sign-off, Permit pack

    Each required role signs the operational sign-off. The permit goes live on the last signature, and the permit pack prints as one document.

    Every required role

On site, the crew works from one brief.

PRIMA gathers each asset owner's rules into one brief for the people digging. It says how far to keep each machine from each service, how often to pothole and who to call if something goes wrong.

  • Each worker accepts the permit before their first pre-start.
  • Each figure in the brief keeps the owner's own words beside it.
  • The crew signs once every pothole is dug and any issues are recorded.

Keep clear

Each owner's own figure, with the owner's rule underneath.

Excavator

  • 3 mElectricity owner (22 kV underground cable)
  • 1 mWater owner (150 mm PVC water main)

    Expose the water main by hand or vacuum excavation before any machine digs within 1.0 m.

    No mechanical excavation is permitted within 1.0 m of a water main until the main has been exposed by hand or non-destructive digging.

If something goes wrong

  • Emergency services000
Part of an example crew brief, as it appears on a permit.

When something changes, the permit shows it.

PRIMA checks these rules when a record is saved, not only on the screen.

A crew member finds a service that is not on the plans.
They record it as an unknown service, and stop work is in force on the permit.
The permit is amended after it is signed.
The amendment waits for revalidation. Pothole work cannot start or be recorded until every required signature is restored.
The permit expires.
Pothole work cannot start or be recorded until the permit is revalidated.
The authoriser has a question about the permit.
They raise a query, or put the permit on hold until it is answered.

From the office, every permit in one place.

Map
Open permits and their work areas on one map.
Analytics
Permits that are expiring or overdue, and where permits are waiting.
Library
Documents and the audit trail.
Asset owner portal
Asset owners sign in to see their conditions on permits.

Book a demo.

Tell us about your work and what you want to see. We will reply to arrange a walkthrough of PRIMA.

Pricing. There is no public price list. Ask about pricing in your message.